Your browser is not supported

Du benutzt einen Browser, den wir nicht mehr unterstützen. Um unsere Website weiterhin nutzen zu können, wähle bitte einen der folgenden unterstützten Browser.

  1. ...
    • Halbleiter
    • Wissenszentrum
    • Innovation Hub
    • How an abatement system upgrade saved ​a leading Semiconductor Manufacturer valuable production time

    How an abatement system upgrade saved ​a leading Semiconductor Manufacturer valuable production time

    /

    An upgrade to reduce your operating cost - Edwards Porous Head

    Wafer throughput and maintaining production uptime is a key priority for our customers. ​

    A chamber going offline and stockers slowing down, leads to a drop in Fab efficiency and wafer throughput.​

    However, the problem is not always in the cleanroom, it can be hidden away in the SubFab. ​

    Powder build up in the abatement system can be a cause of manufacturing downtime and increased SubFab service stops and associated costs.​

    Valuable time for both production and SubFab operations can be lost due to excessive maintenance stops.   With each service interval taking 8 hours and two engineers, this costs valuable production time and maintenance expense.​

    Find out how this leading provider of power semiconductors minimised service costs, saved value production time and eliminated the need for an abatement back-up system. ​

    The Atlas PH Interactive doc thumb

    See how an abatement system upgrade saved a leading Semiconductor Manufacturer valuable production time

    ABONNIEREN

    Möchten Sie Updates per E-Mail erhalten?